On-Grid Solar System for Factories and Warehouses: A Complete Guide

Reading time: 12 min

An on-grid solar system for factories and warehouses has become a solution worth studying for facilities that operate long hours during the day and use large amounts of electricity. Shahen provides complete solutions that start with analyzing consumption and loads and surveying the site, then designing the system and choosing suitable panels, inverters, and protection, through to supply, installation, inspection, commissioning, and performance monitoring.

On-Grid Solar System for Factories and Warehouses

Solar power is particularly relevant in the industrial and logistics sectors because factories and warehouses often have continuous loads and large roof areas that can be used for panels. However, having space available doesn’t mean any design will be suitable; the load profile, working hours, type of equipment, and actually usable area must be studied before deciding the system’s capacity.

What Is an On-Grid Solar System for Factories and Warehouses?

An on-grid solar system for factories and warehouses uses solar panels to produce electricity during daylight hours and connects it to the facility’s electrical system in parallel with the public grid. The facility uses the solar electricity produced to cover part of its loads, while the grid supplies the difference when consumption exceeds the system’s production.

This solution usually relies on solar panels, inverters, mounting structures, cables, and electrical protection, and in its conventional form doesn’t need storage batteries.

You can learn more about Shahen’s on-grid systems and how to choose the right system for your site’s consumption.

How Does the System Work in a Factory or Warehouse?

The idea behind an on-grid solar system for factories and warehouses is to use the panels’ production at the same time as the facility consumes electricity.

In simple terms, the process works like this:

  1. The panels receive sunlight and convert it into direct current (DC).
  2. The electricity goes to the solar inverters.
  3. The inverters convert the current to AC compatible with the facility’s electrical system.
  4. The solar electricity powers the loads running during the day.
  5. If the loads are higher than the panels’ production, the facility draws the extra amount needed from the grid.
  6. Panel production gradually falls as solar radiation decreases.
  7. When there’s no solar production, the grid continues to supply the loads.

This makes the system worth studying for facilities where a large part of their operation is concentrated during daylight hours.

Why Does an On-Grid Solar System Suit the Industrial Sector?

Factories and warehouses have several characteristics that can support the use of solar systems, including high electricity consumption during working hours and, in many facilities, relatively large roof areas.

The main potential benefits include:

  • Reducing the electricity drawn from the grid during the day.
  • Making use of unused roof space.
  • Usually no need for batteries in a conventional system.
  • The ability to monitor system production continuously.
  • Planning the system around the facility’s real consumption.
  • The ability to take future expansion into account.
  • Reducing part of the operating costs linked to electricity consumption.
  • Using a renewable energy source over the project’s service life.

But the size of the benefit varies with the type of activity and the energy consumption pattern, so a technical study should be carried out before installation.

The Importance of Analyzing a Factory’s Consumption Before Design

The first step in designing an on-grid solar system for factories and warehouses is understanding the facility’s consumption precisely.

Relying on a single month’s bill isn’t enough, especially in factories where production rates change between seasons or the number of shifts varies.

It’s best to analyze:

  • Electricity consumption over 12 months, if possible.
  • Daily operating hours.
  • Working days per week.
  • Number of shifts.
  • The continuous base load.
  • Peak consumption periods.
  • Air conditioning and cooling loads.
  • Motors and pumps.
  • Production lines.
  • Warehouse equipment.
  • Any planned expansion.

All this data helps determine the right system size and avoid over- or under-sizing.

Why Does the Load Profile Matter?

Two factories may consume the same amount of electricity each month but not necessarily need the same design.

The reason is the timing of consumption.

If the first factory runs mainly from morning to late afternoon, a large part of its consumption may coincide with the panels’ production hours. The second factory, with larger loads at night, may benefit differently from a grid-tied system.

That’s why designing an on-grid solar system for factories and warehouses benefits from studying the load profile, not just total consumption.

The load profile helps you know:

  • When does consumption start to rise?
  • What is the minimum load?
  • When does the peak load occur?
  • What share of consumption is during the day?
  • Do loads differ at weekends?
  • Do loads change between summer and winter?

The System’s Core Components

The system consists of a set of elements that must be chosen as one integrated system.

Solar Panels

Panels are the main source of energy production, and they differ in:

  • Rated power.
  • Efficiency.
  • Technology used.
  • Dimensions.
  • Warranty.
  • Degradation rate.
  • Suitability for the available space.

In industrial projects, making good use of space becomes important, because the facility may need a large capacity while some areas of the roof can’t be used due to equipment, ventilation openings, or other obstacles.

You can read our article on solar panel prices in Saudi Arabia to learn about the factors that go into the cost of panels and the system.

Solar Inverters

The inverter is a central element in an on-grid solar system for factories and warehouses, converting the energy from the panels into current that can be used within the facility’s electrical system.

Inverters are chosen based on:

  • The system’s total capacity.
  • Panel string layout.
  • Voltage.
  • Characteristics of the internal network.
  • The number of MPPT inputs needed.
  • Inverter efficiency.
  • Monitoring systems.
  • Conditions at the installation location.
  • The project’s engineering requirements.

Panel Mounting Structures

Mounting structures must suit the type of factory or warehouse roof, whether metal, concrete, or another type.

Considerations include:

  • Roof area.
  • Panel orientation.
  • Mounting angle.
  • Structural loads.
  • Equipment layout.
  • Ease of access for maintenance.
  • Row spacing.
  • Walkways.

Cables and Protection

The project isn’t limited to panels and inverters; it needs an electrical system that includes:

  • Suitable DC and AC cables.
  • Breakers.
  • Surge protection.
  • Earthing.
  • Combiner boxes where needed.
  • Distribution boards.
  • Connectors and accessories.

You can look at Shahen’s solar component supply service to learn more about system components.

You can also browse the Shahen solar store to see the product categories and accessories available.

Surveying Factory and Warehouse Roofs

A site survey is an essential stage before installing an on-grid solar system for factories and warehouses.

The roof’s total area is not the same as the area that can take panels.

The roof may contain:

  • AC units.
  • Ventilation openings.
  • Tanks.
  • Mechanical equipment.
  • Maintenance walkways.
  • Shaded areas.
  • Structural elements.
  • Service rooms.

Suitable space must be left for movement, access to equipment, and maintenance work.

The survey also helps determine the cable route, the location of inverters, and the connection points to the electrical system.

Installing Solar on Warehouses

Many warehouses have large roof areas, so they can be good candidates for studying solar panel installation.

But before designing an on-grid solar system for factories and warehouses on a warehouse, the type of roof, its structural capacity, the panel mounting method, and the areas occupied by equipment must be checked.

Loads that may be found in warehouses include:

  • Air conditioning systems.
  • Ventilation.
  • Lighting.
  • Cold rooms.
  • Material handling equipment.
  • Administrative offices.
  • Security and surveillance systems.
  • Chargers and electrical equipment.

The pattern of these loads determines the right system capacity.

On-Grid Systems for Factories

Factories may have larger and more complex loads than warehouses, especially where there are motors, production lines, compressors, pumps, and cooling systems.

So an on-grid solar system for factories and warehouses in the industrial sector shouldn’t be sized from roof area alone.

The actual electrical loads, equipment operating times, shift patterns, and any expected increase in demand from expanding production lines must be studied.

In some facilities it may be better to split the project into phases, according to the engineering study, budget, and investment goals.
On-Grid Solar System for Factories and Warehouses - Shahen

Does the System Need Batteries?

In a conventional grid-tied system, batteries usually aren’t necessary.

The facility uses the energy produced while the sun is shining, while the grid makes up for any shortfall in production.

That’s why an on-grid solar system for factories and warehouses differs from off-grid systems, which need energy storage to run loads when there’s no sun.

If the facility also needs backup power or energy storage for other times, a hybrid system or separate storage solution should be studied according to the loads and the goal.

You can look at off-grid systems to understand the difference between the two types.

The Cost of Solar Installation for Factories and Warehouses

There is no single cost that applies to all projects; the cost of an on-grid solar system for factories and warehouses depends on the size of the project, its components, and site conditions.

The main cost elements include:

  1. System capacity in kilowatts.
  2. Number and power of panels.
  3. Type of panels.
  4. Number and capacity of inverters.
  5. Mounting systems.
  6. Cable run lengths.
  7. Electrical protection.
  8. The type of building roof.
  9. Engineering design work.
  10. Installation work.
  11. Testing and commissioning.
  12. Monitoring systems.
  13. Site connection requirements.
  14. Maintenance and follow-up.

So the price of the panels alone doesn’t represent the final price of the system.

How to Compare Company Offers

When requesting a quotation for an on-grid solar system for factories and warehouses, compare the technical aspects before comparing the total price.

Ask for the offer to include:

  • The system’s total capacity.
  • Number of panels.
  • Manufacturer and model.
  • Panel power.
  • Type of inverters.
  • Number of inverters.
  • Expected energy production.
  • Details of the mounting structures.
  • Cables and protection.
  • The scope of installation work.
  • Monitoring system.
  • Warranty period.
  • Maintenance services.
  • Work excluded from the offer.

An offer may be cheaper because it doesn’t include some work or because the capacity or specifications are different, so compare equivalent offers as far as possible.

Calculating Feasibility and Return on Investment

When studying an on-grid solar system for factories and warehouses, it’s best not to base the decision on the initial project cost alone.

You should consider:

  • The facility’s annual consumption.
  • The system’s expected annual production.
  • How much energy the facility will use directly.
  • Operating hours.
  • Project cost.
  • Maintenance costs.
  • Component quality.
  • Warranties.
  • Expected service life.
  • Possible future growth in consumption.

An economic study of the project can then be built on real data instead of general promises about savings.

Monitoring After Commissioning

Monitoring the production of an on-grid solar system for factories and warehouses provides important data for managing the facility.

You can track:

  • Daily production.
  • Monthly production.
  • Inverter performance.
  • Alerts.
  • Changes in system performance.
  • Production comparisons between periods.
  • Unusual drops in output.

This data helps the maintenance team detect problems early.

Cleaning and Maintaining Panels at Industrial Sites

In some industrial areas, panels may be exposed to more dust than on other buildings, so a cleaning and maintenance plan should be set according to site conditions.

Regular maintenance includes:

  • Inspecting the panels.
  • Cleaning them when needed.
  • Inspecting cables.
  • Reviewing connections.
  • Checking that structures are sound.
  • Inspecting inverters.
  • Reviewing protection systems.
  • Monitoring production data.

Shahen offers maintenance and technical support for solar systems as part of its services.

Why Choose Shahen for Factories and Warehouses?

When installing an on-grid solar system for factories and warehouses, the project needs its study, design, supply, and installation stages linked together.

Shahen First Renewable Energy offers services that include:

  • Studying electricity consumption and loads.
  • Surveying the site.
  • Engineering design.
  • On-grid systems.
  • Supplying solar system components.
  • Installation.
  • Inspection and commissioning.
  • Maintenance and technical support.
  • System performance monitoring.

You can visit Shahen or the Shahen services page to see the solutions available, and browse the Shahen store on Salla for solar products and components.

Mistakes to Avoid Before Installing the System

Common mistakes that can affect the success of an on-grid solar system for factories and warehouses include:

  • Relying on an approximate average consumption.
  • Not studying the load profile.
  • Sizing the system by roof area alone.
  • Buying panels before preparing the design.
  • Ignoring shading on the building.
  • Not reviewing the roof’s structural condition.
  • Choosing inverters on price alone.
  • Using incompatible components.
  • Ignoring electrical protection.
  • Not planning cable routes in advance.
  • Neglecting future expansion.
  • Not putting a maintenance and monitoring plan in place.

Practical Steps Before Requesting a Quotation

Before getting in touch to carry out the project, prepare the following data:

1. Electricity bills

Ideally provide 12 months of data, if available, to understand seasonal variation.

2. Operating times

Define the number of shifts and the working hours of each shift.

3. A list of the main loads

Such as motors, pumps, cooling, air conditioning, and production lines.

4. Expansion plans

Tell the company if you plan to add a production line or new equipment.

5. Roof data

Give an approximate roof area and the equipment on it, then request an actual survey before the final design.

These steps help prepare an on-grid solar system for factories and warehouses based on the project’s real data.

An on-grid solar system for factories and warehouses is an important option to study for industrial and logistics facilities that use a lot of electricity during the day, especially when suitable space for panels is available. But the project’s success depends on analyzing consumption and the load profile, surveying the site, engineering design, choosing compatible components, quality installation, and performance monitoring.

Shahen provides solutions from studying the facility’s needs and design through to component supply, installation, inspection, commissioning, and maintenance.

If you’re planning an on-grid solar system for factories and warehouses, start by preparing your electricity bill data, operating hours, and main loads, then request a survey and technical study from Shahen to get a system that suits your facility instead of relying on general estimates.

Frequently Asked Questions

Is an on-grid system suitable for factories?

Yes. The system can be studied for factories with suitable consumption during daylight hours, but sizing it requires analyzing loads, operating hours, and available space.

Are warehouses suitable for solar panels?

They may be, thanks to the large areas available on many warehouses, but the roof must be surveyed to confirm the usable area, the type of structure, and any obstacles.

Calculate Your Project's Feasibility
Request a free feasibility study for your site and consumption from our engineering team.
More Articles
The Cost of Solar Energy for Farms: Your Complete Guide to Calculating Price and Return
Home Solar Installation in Saudi Arabia: Your Complete Guide to Saving on Electricity
Hybrid Solar Energy Project: A Smart Solution for Stable Power and Lasting Savings
Have a Project?
Request a free site survey for your location.